How long does it take to build a website?

How long does it take to build a website? It depends on the format: 5-7 business days for a landing page, 3-4 weeks for a business website, 4-6 weeks for a premium site. Here is what each stage involves, where weeks get lost and what to prepare so your launch date holds.

The Arar Web Studio teamPublished · 4 min read

In short

A landing page takes 5-7 business days, a business website 3-4 weeks, a premium website 4-6 weeks, and a website with a brand 5-7 weeks. Time counts from the moment we receive your materials, so prompt copy, photos and approvals mean an earlier launch. The timeline is fixed in the contract.

How long it takes to build a website, by format

Every figure counts from the moment we receive your materials.

FormatTimelineScope
Landing page5-7 business daysOne page, up to 8 sections, inquiry form
Business website3-4 weeksUp to 8 pages, two design concepts, CMS, one integration
Premium website4-6 weeksUp to 15 pages, custom UX, two languages
Brand and website5-7 weeksBrand identity and site under one contract

A landing page in 5-7 business days is the fastest route to a live page. A business website takes longer because it has more pages, two concepts to choose from and more approvals. A premium website adds custom UX, art direction and a second language.

The date is not only our build time. Use this formula:

Launch date = day your materials are complete + build time for your format + the days you take to approve.

Price is a separate topic: see website cost.

Stages that make up the timeline

Design, copy, build and SEO run in parallel, and every stage is reviewed and signed off. Here is what happens and what we need from you.

  1. Brief. A 15-20 minute conversation. We fix scope, price and timeline. You describe your offer and your customers.
  2. Structure and copy. We build the page map and write the text. You provide facts and check them for accuracy.
  3. Design. A landing page gets one version, a business website two concepts. You pick a direction and give feedback within the revision rounds in your contract.
  4. Development. The build for phones and desktops, forms, CMS and integration. You tell us where inquiries should go.
  5. Content and QA. We place text and images, then check speed, mobile layout, accessibility and forms. You review the site at a test address.
  6. Launch. We publish on your domain after your approval. You give us domain access.

Where weeks get lost

Production is rarely the bottleneck. Time is lost in waiting. Four causes account for most slipped launches.

CauseWhat happensHow to avoid it
Late materialsWork stalls on a missing logo, photos or factsHand over everything on day one
Slow approvalsEach stage waits days for a yesOne decision-maker who answers quickly
Out-of-plan editsA new page or a changed offer midway means re-doing earlier stagesSettle scope in the brief
Domain and accessLaunch waits for logins or a domain transferCollect logins before kickoff

None of this is a fault. It is how projects work, and it is why a timeline without a start condition is only a guess.

Checklist: what to prepare before kickoff

Gather these in one folder. It shortens the project more than any speeding up of production.

  • Logo in source form, if you have one
  • Photos of your work, place, team or product
  • Contact details: email, messengers, address, opening hours
  • Your services with prices as you want them shown
  • Legal details you want on the site
  • Domain and hosting logins, if they exist
  • Logins for tools to connect: booking, CRM, forms
  • Two or three reference sites and what you like about them
  • One decision-maker who approves every stage
  • Any hard date: an opening, a campaign, an event

Missing something? Say so in the brief. We advise what to shoot and which licensed images would fit.

How we lock the timeline

We name the timeline before work starts and write it into the contract with the price. Payment is in stages: 50% before we begin and 50% after your approval, before publishing. One contact runs the project from brief to launch.

After handover, the warranty is lifetime while you are on a care plan, and 6 months without one.

Questions about website timelines

Can’t find your answer? All questions →

Can a website be built in a week?
Only a landing page, within 5-7 business days from receiving your materials. A business or premium website has more pages, design concepts and approvals, so promising a week would mean skipping steps. If you have a launch date, put it in the brief.
Why do websites take longer than promised?
Usually because of waiting, not building: materials arrive late, answers take days, or the scope changes midway. Ask any studio when the clock starts, and make sure the timeline is written into the contract.
What do I need to provide to speed things up?
Four things move the date most: complete materials on day one, a single decision-maker, quick answers at each stage and a scope that stays fixed. The checklist above covers the materials.
How long until my site shows up in Google?
Nobody can say exactly. Google finds new pages through links and its own crawling, which can take days to weeks, and inclusion is never guaranteed. We build the foundation: structure, markup, sitemap and speed. We do not promise timing or positions.
Does a faster timeline cost more?
Our timelines are set by format and fixed in the contract. The surest way to launch earlier is to be ready on your side. If you have a hard date, mention it in the brief and we will tell you which format fits.